Project · Frankston

Brick Veneer House Demolition in Frankston

This brick veneer house in Frankston had been significantly damaged by fire, with the roof having caught alight before our team arrived. The crew completed the full demolition in two days. The fire damage made this a more involved job than a standard knockdown: rather than processing the materials the way you would on a conventional, undamaged house, the burnt timber had to be carefully separated out so it could be recycled through alternative channels suited to fire-affected material. Even with that added step, the team finished the job within the standard two-day turnaround.

Brick veneer house demolition in Frankston: during demolition
During demolition
Brick veneer house demolition in Frankston: during demolition (photo 2)
During demolition